Preparations for Steel Silos Before They Are Put into Use

Because of the fast construction speed and low manpower demand, the steel silos are favored in various related industries. However, there are many preparation work to be done before a steel silo is put into use that many people don not know. Preparations of Auxiliary Equipment In the late stage of the  steel silo construction process , mechanical equipment, electrical equipment, automatic control systems, inspection devices, monitoring devices, etc. must be installed, tested and commissioned before the steel silo is used. If problems are found, they must be processed in time.  Mechanical equipment includes: belt conveyor, air cushion belt conveyor, buried scraper conveyor, bucket lifter, warehouse bottom auger, clearance scraper, loading machine, packing machine, belt conveyor, scraper, etc.; weighing machinery Including the middle ground, truck scales, track scales, mechanical scales, electronic scales, etc.; cleaning machines include self-balance vibrating screens, plane rotatin